Our Current Projects

Sr. No.ProjectScope of WorkDeveloper/ClientEstimated Value of Work.[lacs]Status
1.Mavar HEP (6.4 MW), J&KDesign, Engineering, Site Fabrication, Erection and testing commissioning of Penstock & accessories, Gates, Trash Rack & Accessories and other HMM worksDeveloper/Client: O2Z Trading Pvt. Ltd. – Srinagar (J&K)300In Progress
2.Chirchind-II HEP (13.0 MW), Himachal Pradesh, IndiaSite Fabrication, Erection and testing commissioning of Penstock & accessories, Gates, Trash Rack & Accessories and other HM worksDevolper/Client: GTV Engineering Ltd. - Mumbai, Maharashtra, India650In Progress
3.Soiel Dashal HEP (9.0 MW), Himachal Pradesh, IndiaDesign, Engineering, Fabrication, Erection and testing commissioning of Penstock & accessories, Gates, Trash Rack & Accessories and other HM worksDeveloper/Client: M/s Soiel Dashal Hydro Power Pvt. Ltd., Shimla, Himachal Pradesh, India200Design engineering is in progress
4.Tidong-1 (3x50 MW) Hydro-electric Project, Distt.- Kinnaur (H.P.), IndiaErection of Steel Liners in 100 m deep, 10.0 m dia. Surge Shaft i.c. Orifice and Pipe connections with PenstockDeveloper: Tidong Power Generation Pvt. Ltd. (An Unit of Statkraft (India) Pvt. Ltd.) 108In Progress
5.Tidong-1 (3x50 MW) Hydro-electric Project, Distt.- Kinnaur (H.P.), IndiaErection/Installation of Vertical Lift Slide Type Gates, Trash Racks & its Accessories. (All Gates of the Project)Developer: Tidong Power Generation Pvt. Ltd. (An Unit of Statkraft (India) Pvt. Ltd.)85To be started